Migration from VMware to AWS 2019-06-07T11:58:12+00:00

Migration from VMware to AWS

Simple way to move VMware workloads to Amazon Web Services without production impact

Contact Us

Supported Applications

Live cloud migration from VMware to AWS
with no production impact

Start live background
replication of production
workloads

Launch operational business
applications on target AWS with
automated orchestration

Run a set of functional and
performance tests before
switching production

Do final migration or cutover
within a small and predictable
maintenance window

1. Live background replication of production workloads

Start consistent replication of any types of workloads, business applications, machines data and metadata. Hystax Live Cloud Migration solution uses background data replication between two sites, no downtime or performance impact on production workloads. Network utilization is optimized by built-in deduplication and WAN-optimization technologies. Read more>

2. Automated orchestration launches fully operational business applications on target AWS

All machines described in the plan will be automatically started in accordance with the orchestration conditions. To manage the functionality to start / stop machines select machines and click Start or Stop in the menu Actions. Read more>

1. Live background replication of production workloads

Start consistent replication of any types of workloads, business applications, machines data and metadata. Hystax Live Cloud Migration solution uses background data replication between two sites, no downtime or performance impact on production workloads. Network utilization is optimized by built-in deduplication and WAN-optimization technologies. Read more>

2. Automated orchestration launches fully operational business applications on target AWS

All machines described in the plan will be automatically started in accordance with the orchestration conditions. To manage the functionality to start / stop machines select machines and click Start or Stop in the menu Actions. Read more>

Download a step-by-step migration guide
Download a Guide

3. Run an unlimited number of test migration before switching production

Hystax Live Cloud MIgration solution provides an automated way to launch test business applications on a target site without stopping production to build confidence before doing final migration or cutover. Read more>

4. Do final Migration or cutover in minutes

Full automation of the migration process with respect to business application structure and topology makes cloud migration fast, secure and straightforward. Read more>

3. Run an unlimited number of test migration before switching production

Hystax Live Cloud MIgration solution provides an automated way to launch test business applications on a target site without stopping production to build confidence before doing final migration or cutover. Read more>

4. Do final Migration or cutover in minutes

Full automation of the migration process with respect to business application structure and topology makes cloud migration fast, secure and straightforward. Read more>

Get the fundamentally new cloud migration and DR solution

Ready to talk?