Whitepaper 'FinOps and cost management for Kubernetes'
Please consider giving OptScale a Star on GitHub, it is 100% open source. It would increase its visibility to others and expedite product development. Thank you!
Ebook 'From FinOps to proven cloud cost management & optimization strategies'
OptScale FinOps
OptScale — FinOps
FinOps overview
Cost optimization:
AWS
MS Azure
Google Cloud
Alibaba Cloud
Kubernetes
MLOps
OptScale — MLOps
ML/AI Profiling
ML/AI Optimization
Big Data Profiling
OPTSCALE PRICING
cloud migration
Acura — Cloud migration
Overview
Database replatforming
Migration to:
AWS
MS Azure
Google Cloud
Alibaba Cloud
VMWare
OpenStack
KVM
Public Cloud
Migration from:
On-premise
disaster recovery
Acura — DR & cloud backup
Overview
Migration to:
AWS
MS Azure
Google Cloud
Alibaba Cloud
VMWare
OpenStack
KVM
Technical whitepapers

Hystax Acura Cloud Migration step-by-step guide

Hystax Acura cloud migration guide

To perform cloud migration you need to complete the following steps:

Protection flow

  1. Login to the Hystax Acura Control Panel deployed as a part of the solution (refer to https://hystax.com/support/  for more information on deployment instructions) and navigate to the customer dashboard for a customer you target to perform cloud migration.
hystax acura migration customer dashboard

2. On a customer dashboard you can find information about replicated machines, Migration Plans, and Migrations running on a target cloud. By default, no resources are available for a new customer.

3. Click on the ‘Download agents’ button in the main menu, select a customer for which machines need to be replicated and download a replication agent.

There are three types of replication agents:

4. When any of the agents are deployed, the machine with it (or all machines on the same ESXi host where the agent is located) will appear in Hystax Acura Control Panel under the customer dashboard in the Discovered state.

5. To start replication of machines, select the machines and click ‘Start replication’ under ‘Bulk actions’ or for any of the machines specifically. After ‘Start replication’ is performed, machines will be replicated to a target cloud, first, Hystax Acura takes full replicas and, later, incremental replicas according to a schedule set globally for all the machines or for any group of machines or for any machines specifically.

6. To change replication schedule, navigate to Replication schedule under a machine settings or Bulk actions. Refer to https://hystax.com/documentation/disaster-recovery-and-cloud-backup/dr_overview.html#edit-replication-schedule for more information on configuring the settings.

Run migration flow

7. Migration is based on Migration Plans which are scenarios of what needs to be migrated and in what order. Refer to https://hystax.com/documentation/disaster-recovery-and-cloud-backup/dr_overview.html#disaster-recovery-plans for more information about Migration Plans.

To create a Migration Plan click Add on Migration Plans region.

hystax acura create migration plan

8. While creating a Migration Plan orchestration is available under Basic and Expert modes. Basic mode helps to generate a plan with standard settings, expert mode is a JSON script with more powerful settings described under https://hystax.com/documentation/disaster-recovery-and-cloud-backup/dr_overview.html#dr-plan-syntax.

9. Add all the machines that need to be migrated, place them into ranks, and set correct IP addresses, networks, and boot delays.

10. When the Migration Plan is ready, you can run test or production failovers. To run a migration, select a Migration Plan and click Run Migration.

hystax acura run migration

11. On a third step select a restore point for the migration by selecting Restore point time. For all of the machines selected the closest snapshot in the past will be taken. Click Run Migration to start the process.

12. When a migration is running you can see and control its status on the Cloud Site page available via customer dashboard.

13. When you are done with test migration you can delete it and start a new one. For the final cutover, just detach Hystax Acura from the migration and Hystax Acura will stop tracking any resources belonging to this migration.

hystax acura migration final cutover

For any questions, refer to https://hystax.com/support/ or contact the Hystax support team at [email protected].

To run ML/AI or any workload with optimal performance and infrastructure cost with OptScale – a FinOps and MLOps open source platformcontact us today.

Contacts

Email: [email protected], [email protected]
Phone: +16282511280
Address: 1250 Borregas Avenue Sunnyvale, CA 94089

Enter your email to be notified about new and relevant content.

You can unsubscribe from these communications at any time. Privacy Policy